Send the latest drawings, section schedule and bill of quantities. Identify tolerances, connection and welding requirements, coating, inspection and delivery sequence. Include site access, lifting constraints and responsibilities where erection is required.
Check where each scope starts and ends
Match each item in the bill of quantities to the drawing revision. Call out what is supplied by others, including foundations, anchors or cladding where applicable. List shop fabrication, coating, delivery and site erection as distinct line items when you need comparable prices.